Kuwait Power Cuts Amid Rising Demand and Initiatives
Kuwait Power Cuts Amid Rising Demand and Initiatives

Kuwait Power Cuts Amid Rising Demand and Initiatives

News summary

Kuwait has implemented temporary power cuts in several rural and industrial areas due to increased demand outstripping the capacity of power plants currently undergoing maintenance. The Ministry of Electricity, Water, and Renewable Energy announced that areas such as Sabhan, Sulaibiya, and Shuwaikh were affected, urging residents to conserve electricity, particularly during peak times. These measures, including drawing power from the Gulf Cooperation Council's interconnection grid, are part of preparations for the summer when temperatures soar, leading to increased electricity consumption. Last year's similar situation prompted Kuwait to import electricity from neighboring Gulf countries and sign a long-term LNG supply deal with Qatar. Additionally, Kuwait has signed a framework agreement with China to develop renewable energy projects to prevent future power crises. The situation is being closely monitored by Minister Dr. Subaih Al-Mukhaizeem to ensure stability in the national grid.

Story Coverage
Bias Distribution
50% Center
Information Sources
71639883-fbbd-48af-8cc3-393f63e7b2efa3544a73-dab3-486d-ae75-bd4d15f01f55
Left 50%
Center 50%
Coverage Details
Total News Sources
2
Left
1
Center
1
Right
0
Unrated
0
Last Updated
32 days ago
Bias Distribution
50% Center
Related News
Daily Index

Negative

23Serious

Neutral

Optimistic

Positive

Ask VT AI
Story Coverage
Subscribe

Stay in the know

Get the latest news, exclusive insights, and curated content delivered straight to your inbox.

Present

Gift Subscriptions

The perfect gift for understanding
news from all angles.

Related News
Recommended News